Search results
-
V.2(30), 2017
2-8Abstact. During automated rheostat tests of locomotives itʹs necessary to control a lot of parameters of the diesel generator set and support systems. Due to the features of perception of the information by human the control is brought to the observation of a small number of parameters. Implementation in practice of rheostat tests of automated systems of inspection and testing allowed to expand the amount of received information. In this article is offered using automated control systems of diesel-generator sets parameters during rheostat tests which allow to accumulate and analyze test date using developed protocols forms and pivot tables with parameters in entire range of loads, also it helps to determine the quantitative index of a technical condition of diesel-generator set. -
V.1(61), 2025
49-59The article discusses the urgent problem of upgrading non-public railway tracks through the introduction of automated loading and unloading control systems. The relevance of the study is due to the significant proportion of non-public tracks in the Russian railway infrastructure (29 % of the total length) and their constant increase, the growing volume of industrial production in the country and the need to improve the efficiency of transport services for enterprises and improve the efficiency of their use. More than 85 % of all freight traffic by rail starts and ends on non-public roads. The correctness of the service, organization and technology of the operation of the considered routes affects the operation of the entire transport network. The problem of the study lies in the fact that traditionally accepted methods of loading and unloading operations on non-public tracks do not provide the necessary efficiency of the transportation process, which leads to long downtime of rolling stock and increased operating costs for railway transport. The methods of system analysis, mathematical modeling and comparative analysis of statistical data are used in the work. Based on a study of international experience and domestic practice, it has been shown that the introduction of automated control systems can reduce the downtime of wagons by 25 - 30 % and reduce operating costs by 15 - 20 %. The article presents the definition of an automated loading and unloading management system as an integrated information management system that integrates hardware and software. A step-by-step methodology for system implementation has been developed, including seven consecutive stages from preliminary analysis to optimization and development. The proposed solutions take into account the specifics of Russian operating conditions and import substitution requirements. -
V.2(50), 2022
135-142The article presents the results of the development and implementation of a method for controlling the technological processes of repairing locomotives based on network planning. The methodology allows you to track online bottlenecks during current repairs and reduce the duration of the critical path by varying the time indicators of events and works, using the aggregate-nodal repair method, redistributing resources between critical and non-critical works. The developed methodology is based on the adjustment of basic repair networks, taking into account the workload of process equipment and repair personnel, the availability of spare parts and materials, the need for unscheduled work during the planned installation of a particular locomotive for repair. This approach was implemented within the framework of the automated control system (ACS) «Network Schedule» and provides control and adjustment of the implementation of technological operations according to the indicators of technological preparation of repairs. An algorithm has been developed for determining a generalized performance indicator when assessing the quality of functioning of an automated maintenance and repair control system for a locomotive in service locomotive depots.