V.1(29), 2017
56-63The existing protection does not provide protective potential of traction substation grounding grid for the entire period of operation. This disadvantage is removed by improving of automatic drainage unit. The basis of the automatic drainage system is automatic control of drainage current by changing the pulse width of current. This method of current control allows the defined potential remain at the set value. The article presents a functional diagram describing the basic units of the improved automatic drainage unit. The results of the automatic drainage unit tests illustrate that the automatic drainage unit limits the current flowing through the grounding grid to the traction substation, allowing the potential remain at the set value Improved automatic drainage unit has great advantages in relation to existing and operated drain units at this moment and it can be recommended for introduction to the electrification infrastructure of the railway industry. Also this automatic drainage unit can be used for protection of other metal underground structures such as pipelines and other metal structures influenced by stray currents. -
V.3(27), 2016
83-91The article presents a method of the additional resistance calculating of ground grid drainage unit. This work has two main objectives: development of algorithm for determining the optimal values of additional resistance and to study the possibility of reducing losses in reverse traction network through drainage unit of traction substation. The calculation is carried out with a view to ensuring the normative values of the protective potential on the grounding grid and minimize losses in the reverse traction network. The method is based on the application of the reciprocity theorem, which allows to change the direction of the currents from the source to the load on the reverse one if the system is linear. The calculation of the values of additional resistance and power loss in the reverse traction network for average current on the considered traction substation of the Western-Siberian railway. In results the selection method of optimal values for the additional resistance is offered. This method can be used for designing of traction substation grounding grid protection. -
V.1(37), 2019
92-101The paper deals with the protection of the buried structures under the influence of DC traction network stray currents. The paper presents an algorithm for joint operation of drainage units for simultaneous protection of the grounding grid and two isolated underground conductors with priority protection of the grounding grid. The proposed algorithm of joint drainage protection of buried structures allows providing the possibility of optimal protection: simultaneous keeping of the protective potential of buried structures with the minimum required drainage current, which allows reducing energy costs, reducing corrosion damage and extend the operating life of buried structures. -
V.1(29), 2017
112-118In the article the issues on creation of branch of track width when changing it in the curved track with radius less than 350 m. Presented the existing methods of widening or narrowing the width of the track in the curves section of track. We propose a method of change of gauge in curved track is from 1520 to 1530 or 1535 mm. to the Proposed method of drainage of the track width is carried out by the existing structures of the elements of the superstructure. The proposed method of drainage of the track width gives a smooth fit of the rolling stock in curve track section and provides the requirements of the applicable standards.