Search results
-
V.3(39), 2019
57-67This article presents the results of changes calculations in the energy efficiency indicators of the Moscow Central Ring, such as the specific consumption of electricity released for traction by trains of traction substation meters, specific recovery, technical losses of electricity in the traction power supply system when it is transferred to electric rolling stock, including technical recuperation energy loss, depending on various installation options of rectifier-inverter converters in traction substations part. -
V.4(44), 2020
97-104Determination of the methodical error in measuring the active energy loss in the dc traction network
The article is devoted to the issue of power loss measurement in DC traction networks. The purpose of the work is to define the indicators characterizing the degree of determining the energy loss values accuracy when using the method of restoration of the train situation. In the article the analysis of methodical error the value arising at measurement of power losses in a traction DC network is conducted. The occurrence of the error is caused by the indirect measurement method, which is based on the principle of synthesis of instantaneous circuits in real time. The synthesis is based on direct measurements of currents and voltages on the busbars of adjacent feeding and switching points, for example, a traction substation and a sectionalizing station. The data obtained are processed in accordance with the algorithms adopted in the article, as a result of which the coordinates of loads and their current consumption are calculated. In the process of synthesizing instantaneous circuits, it is possible that such a train situation may occur, which will lead to the emergence of a methodical measurement error, due to the peculiarities of the logical and mathematical apparatus of the train situation recovery method. In this paper, has been performed a probabilistic analysis of the possibility of occurrence of methodological error when several traction loads will be present simultaneously on the measuring section, that is, the dependence of the occurrence of the measure of uncertainty on the daily size of train traffic and the dependence of the occurrence of the measure of uncertainty on the minimum inter-train interval. As a result of the study, the proposed method application the limits were established by energy loss measurement the permissible error the criterion. The methodological error the value of the measurement at different variants method of movement on the railroad studied section was assessed -
V.1(41), 2020
98-107This article presents the rationale for the need to change the methodology for determining the absolute and relative values of energy losses to train traction. It is shown that when determining the relative value of the losses, it is necessary to take into account the amount of recovery energy returned to the contact network by electric rolling stock meters. To increase the accuracy of determining the absolute value of losses, it is necessary to take into account the energy consumption for the needs of the traction power supply system for prophylactic heating and smelting of ice on the wires of the contact network, as well as to ensure uninterrupted voltage on inactive electrified sections of railways. A formula is proposed for estimating the component of electric power losses in the contact network from the flow of energy recovery taking into account changes in the methodology for determining the loses of electric power for train traction.