Search results
-
V.3(39), 2019
57-67This article presents the results of changes calculations in the energy efficiency indicators of the Moscow Central Ring, such as the specific consumption of electricity released for traction by trains of traction substation meters, specific recovery, technical losses of electricity in the traction power supply system when it is transferred to electric rolling stock, including technical recuperation energy loss, depending on various installation options of rectifier-inverter converters in traction substations part. -
V.1(41), 2020
98-107This article presents the rationale for the need to change the methodology for determining the absolute and relative values of energy losses to train traction. It is shown that when determining the relative value of the losses, it is necessary to take into account the amount of recovery energy returned to the contact network by electric rolling stock meters. To increase the accuracy of determining the absolute value of losses, it is necessary to take into account the energy consumption for the needs of the traction power supply system for prophylactic heating and smelting of ice on the wires of the contact network, as well as to ensure uninterrupted voltage on inactive electrified sections of railways. A formula is proposed for estimating the component of electric power losses in the contact network from the flow of energy recovery taking into account changes in the methodology for determining the loses of electric power for train traction.