• Рус Русский
  • Eng English (UK)

Scientific and technical journal established by OSTU. Media registration number: ПИ № ФС77-75780 dated May 23, 2019. ISSN: 2220-4245. Subscription index in the online catalog «Subscription Press» (www.akc.ru): E28002. Subscription to the electronic version is available on the «Rucont» platform.
The journal is included in the Russian Science Citation Index and in the List of Russian Scientific Journals .

Search results

  • V.2(42), 2020
    60-70

    Improving the productivity of the assembly line kb03

    To increase the level of mechanization and automation of the assembly processes of rail and sleepers, link assembly lines are installed at the production bases of the track machine stations. In 2012, a semi-automatic link assembly line of KB03 brand was introduced on the Belarusian Railways for the assembly of a rail-and-sleep grid on reinforced concrete sleepers with an SB-3 intermediate fastening. Increasing the productivity of this line is a priority area in research, since in modern conditions there is an increase in the volume of overdue railway track repairs. In the course of the study, it was determined that the most rational solution for studying the work of a link assembly line and finding ways to increase the productivity of its work is to use simulation tools. After studying the technical and other accompanying documentation, a simulation model of the KB03 assembly line was developed. Then the developed model was validated, during which it was found trustworthy and suitable for experiments. Based on the analysis of the results of the experiments carried out on the model, solutions were formed to control the production process of the KB03 assembly line to obtain the maximum increase in its productivity. The calculation of the economic feasibility of introducing the proposed changes and adjustments to the technological process of the link assembly line in production was carried out.