Search results
-
V.2(34), 2018
76-85The article analyzes the results of the assessment operating time and power consumption of compressor equipment service locomotive depo Moscow West-Siberian Railway. The algorithms for data preparation for modeling and evaluating the efficiency of the production process are presented. The main factors influencing the power consumption of the compressor equipment are determined and the results of the assessment of their influence are presented. On the basis of the dependences obtained, a mathematical model of the process of power consumption of compressor equipment using fuzzy neural networks and its accuracy is determined. The interface of the developed program complex is presented at an estimation of influence of factors on process of power consumption of the equipment service locomotive depo Moscow West-Siberian Railway.