Search results
-
V.3(23), 2015
85-94Is executed the analysis of the special features of the territorially distributed objects of rail transport for developing the systems of video surveillance and video registration. Is proposed the three-stage design procedure of such systems, at basis of which lies the separation of entire system into the zones of video surveillance, zones of video registration and the information clusters, which ensure the optimization of system on the criterion of minimum expenditures. -
V.3(27), 2016
99-110Is executed the analysis of the special features of the process of the optimization of the complex systems of video surveillance and video registration in the territorially distributed objects of rail transport. Is proposed the procedure of setting optimization problem during the local level for the group of adjacent clusters into supers-clusters and the step-by-step optimization of entire system at the global level. The procedure of two-level optimization and the association of the adjacent information clusters of system into the supers-cluster make it possible to combine the methods of linear and dynamic programming for the optimization of the complex branched systems on the criterion of minimum expenditures. -
V.2(50), 2022
135-142The article presents the results of the development and implementation of a method for controlling the technological processes of repairing locomotives based on network planning. The methodology allows you to track online bottlenecks during current repairs and reduce the duration of the critical path by varying the time indicators of events and works, using the aggregate-nodal repair method, redistributing resources between critical and non-critical works. The developed methodology is based on the adjustment of basic repair networks, taking into account the workload of process equipment and repair personnel, the availability of spare parts and materials, the need for unscheduled work during the planned installation of a particular locomotive for repair. This approach was implemented within the framework of the automated control system (ACS) «Network Schedule» and provides control and adjustment of the implementation of technological operations according to the indicators of technological preparation of repairs. An algorithm has been developed for determining a generalized performance indicator when assessing the quality of functioning of an automated maintenance and repair control system for a locomotive in service locomotive depots.