  • V.4(36), 2018
    87-95

    The protection of the contact network of a direct currentat forced modes

    The article considers the issue of providing protection for the contact network when removing 3.3 kV traction substations from the Nazivoye direction of the Omsk power supply distance of the West Siberian Railway. When the 3.3 kV switchgear is brought out to repair, the protection zone for connection of the contact network of adjacent traction power supply system objects (traction substations, sectionalizing stations, parallel connection points) increases. To ensure the protection of the DC contact network, lowered settings for the operation of high-speed circuit breakers are introduced, which inevitably limit the capacity of the section for the passage of freight trains. Considered the existing order of withdrawal of equipment for repair with the inclusion of a traction substation post section. The limitations of skipping freight trains during the implementation of the existing scheme are estimated. Short circuit currents are also calculated and the settings for the protection of high-speed circuit breakers are selected when the sectioning station is switched off and the sectional disconnectors of the station are switched on. It was found that the condition for selecting the protection settings is not fulfilled when detaching from the minimum value of the short-circuit current. To reduce the limitations, a prototype of a short-circuit contactor of a direct current 3.3 kV grid has been developed. The use of a short-circuit-breaker allowed the protection of the contact network, for the time of the withdrawal of the switchgear equipment for repair, without transferring to lower settings for the operation of circuit breakers. Also in the article are given the technical characteristics and features of the proposed device design. The results of a test of a short-circuit of a 3.3 kV direct current contact network in the Dragunskaya-Novokievskaya-Lubinskaya section are presented. The main directions for further work are determined.
  • V.2(50), 2022
    96-107

    Aerodynamic impact of the high-speed electric train «afrosiyob» on opposite trains

    At present, the “Afrosiyob” high-speed passenger train runs on the Tashkent - Samarkand, Samarkand - Karshi, Samarkand - Bukhara sections. In the near future, it is planned to launch freight trains on sections of the Bukhara-Misken route. On high-speed double - track sections Tashkent - Samarkand, Samarkand-Navаi, the movement of freight trains is combined with passenger trains. Which, in turn, negatively affects the throughput of stations and hauls. In connection with this, the actual issue is the movement of freight trains on these sections. Additional research is needed to increase the capacity of sections where freight and high-speed passenger trains run. The article considers options for the aerodynamic interaction of freight and high - speed passenger trains moving in one or the opposite direction. At the same time, the idea of the safe organization of freight trains during the movement of high-speed passenger trains was put forward. As a result of this study, the possibilities of carrying cargo trains in one direction or in the opposite direction are determined by ensuring the safety of movement on two-way parcels in which high-speed “Afrosiyob” high - speed electric trains travel. This makes it possible to develop recommendations for more effective use of the ability of parcels to conduct trains. When calculating the aerodynamic interaction, scientific ideas put forward by scientists from Europe, the USA, Russia and other countries were analyzed. Methods for solving the Navier - Stokes equations using existing programming models are described.
  • V.1(29), 2017
    99-105

    The software module of formation of the panoramic image of an internal surface of an underground part of hollow reinforced concrete support of contact network and the analysis of the recognizable inhomogeneities

    Now there is no efficient decision to estimate a corrosion condition of an underground part of reinforced concrete support of contact network which is not demanding digging of a support. This problem makes actual a task of development of a hardware and software system of definition of a corrosion condition of an underground part of reinforced concrete support of contact network. As a result of work the software module allowing to realize panoramic shooting of an internal surface of an underground part of a support, to increase quality of the received images, to carry out searching of inhomogeneities and to determine their geometrical parameters, and also to make the analysis of the found inhomogeneities. Implementation of results of work will allow to reduce time and labor costs, and also to increase efficiency of diagnostic works on support of contact network.
  • V.3(23), 2015
    118-123

    Improving the safety of operation of cranes and recovery train

    In the article the analysis of safety when lifting one of the two cargo lifting cranes. Considered a method of increasing safety of works with the use of a radio channel for transmission and reception of information about the condition of the crane equipment, signals for controlling crane operations safety systems for cranes from crane operators and slingers, verbal exchange of information between the crane operators and slingers.