Search results
-
V.4(32), 2017
68-77In article the reasons of shutdowns of high-speed switches of a direct current are analysed and distribution of the disconnected currents is received. Such numerical characteristics as population mean and a mean square deviation of function of distribution of the currents which are disconnected by the high-speed switch are considered. The hypothesis of distribution of probability of refusal in operation of the switch is checked. Conclusions are drawn on applicability of the given calculation methods for definition of admissible number of shutdowns of high-speed switches on sites of traction network of a direct current.