Search results
-
V.3(27), 2016
2-9The article includes research results of substantiation 3ТЕ10М diеsel locomotive`s movement work parameters on a hilly-mountainous direction of railway while moving freight trains with stops and without any stops on the spaces stations and separating points -
V.2(50), 2022
12-29An increase in the speeds of the electric rolling stock has an impact on the energy indicators of the operation of the traction power supply system. One of the technical solutions to the task of equalizing the traction load schedule to reduce voltage losses in the contact network is the use of electricity storage systems. The article presents the results of simulation modeling, which allow us to estimate the change in the energy indicators of an electric train with an increase in movement speeds for conditions of a single electric train following a section. According to the results of traction calculations, the influence of the voltage level on the electric train current collector on the technical speed is shown, the deviation of which for the typical voltage values in high-speed traffic is about 1%. For the selected section of rapid movement and technical speeds, the voltage level for traction calculations is justified. The dependences of the change in the average values of the load and the technical speed with an increase in the maximum speed up to 250 km/h are determined. Statistical estimates for the voltage on the pantograph of the Velaro RUS electric train are determined. The influence of the energy intensity of the onboard storage system with the corresponding charging characteristic on the reduction of maximum currents is shown. Dependences are obtained for the voltage drop on the electric train current collectors with an increase in movement speeds. The assessment of the maximum energy intensity of storage devices for the most severe operating conditions with a single electric train track on the site was carried out. These results allow us to determine the prospects for improving the method of calculating energy indicators and the use of accumulation systems in areas of rapid movement as on-board systems and compare their effectiveness with stationary systems based on simulation modeling, in which various control algorithms are implemented. -
V.1(37), 2019
54-63With the purpose of providing capacity on the West-Siberian railway, in recent times, adjustable reactive power compensation devices have been introduced. The schematic construction and parameters of such devices on the market are significantly different. In connection with this, it is necessary to choose from the set of schemes the most effective, corresponding to specific technical and economic conditions. The article assesses the power losses in the main equipment of two devices from different manufacturers, namely static thyristor compensators of reactive power produced by "KER Holding" Kazan and "Aidis groups" Moscow, installed on the Alambay and Novaya Dubrava sectional posts of the West Siberian Iron roads. The power losses in the equipment are calculated taking into account additional losses from the influence of higher harmonic components. The analysis of the circuit design of both devices in terms of loss reduction is carried out. Dependences of power losses in their elements on the generated reactive power and the current of the thyristor-reactor group are constructed. Probabilistic functions of the distribution of the current of the titrator-reactor groups of devices are given at preset settings. The results of measurements of power consumption of devices for own needs are presented. The effect of reducing power losses in the traction network from switching devices with losses in their main equipment is compared. On the basis of the work done, the elements with the greatest losses are identified. The features of each device, affecting the power loss in the main equipment, are described. Conclusions are drawn about the effectiveness of the schemes under consideration. Methods for reducing power losses in basic equipment and consumption for energy consumption are proposed. -
V.3(43), 2020
76-85The problem of the assessment of the continuous welded rail track stability at its thermal elongation is considered in this paper. The method for determining the stress-strain state of various elastic objects developed by the specialists of JSC “VNIKTI” is analyzed on the example of a rail of a continuous-welded track section. The essence of the method is to determine the dependence of the natural frequencies of rail vibrations on the applied longitudinal force. As a means of obtaining such a dependence, a modal analysis of a track section model carried out using the finite element method was chosen. The methodology for calculating the natural frequencies of rail vibrations and the description of the created model of the track section and its properties are presented in the paper, the contact interactions of the model elements and boundary conditions are defined in it. Calculations for determining the natural frequencies and modes of rail vibrations are performed, the first four modes of rail vibrations obtained by calculation and experimental methods are shown. The assessment of the adequacy of the created model of the track section is carried out by comparing the natural frequencies and modes of rail vibrations obtained by calculation, by modal analysis methods and experimentally when measuring vibrations on a full-scale object - assembled rails and sleepers, having a similar design compared with the model. It was decided to use the distance between the vibration nodes as a criterion for comparing the obtained modes of natural rail vibrations. The first mode of vibration is selected for further studies. Calculations were carried out and the dependence of the natural frequency of the first vibration mode of the rail on the longitudinal force applied to it was obtained using the created model of the track section. The obtained dependence can be used in the method proposed by the specialists of JSC “VNIKTI” in order to determine longitudinal force, applied to the rails on the full-scale section of the continuous welded rail track. -
V.2(50), 2022
96-107At present, the “Afrosiyob” high-speed passenger train runs on the Tashkent - Samarkand, Samarkand - Karshi, Samarkand - Bukhara sections. In the near future, it is planned to launch freight trains on sections of the Bukhara-Misken route. On high-speed double - track sections Tashkent - Samarkand, Samarkand-Navаi, the movement of freight trains is combined with passenger trains. Which, in turn, negatively affects the throughput of stations and hauls. In connection with this, the actual issue is the movement of freight trains on these sections. Additional research is needed to increase the capacity of sections where freight and high-speed passenger trains run. The article considers options for the aerodynamic interaction of freight and high - speed passenger trains moving in one or the opposite direction. At the same time, the idea of the safe organization of freight trains during the movement of high-speed passenger trains was put forward. As a result of this study, the possibilities of carrying cargo trains in one direction or in the opposite direction are determined by ensuring the safety of movement on two-way parcels in which high-speed “Afrosiyob” high - speed electric trains travel. This makes it possible to develop recommendations for more effective use of the ability of parcels to conduct trains. When calculating the aerodynamic interaction, scientific ideas put forward by scientists from Europe, the USA, Russia and other countries were analyzed. Methods for solving the Navier - Stokes equations using existing programming models are described. -
V.2(14), 2013
102-112In the context of the objectives of and compliance with transportation of corridors for rolling stock and improving the technology of transportation of different modes of transport considered minimization of the geometric factor in positioning navigation, peculiarities of determination of errors of coordinate of the moving objects along physically fixed trajectories on the plane, it is proved the statement about the possibility of recovery of the trajectory of the mobile point on the plane with continuous or discrete measurements of one coordinate. -
V.1(45), 2021
104-113Special attention on the Belarusian Railway is paid to the issues of operation of curved-linear sections of the track, since in the framework of solving the problem of increasing train speeds; one of the significant obstacles to changing the speed regime is the discrepancy between the actual position of the curve of the project documentation. The automated systems of mobile diagnostic tools used on the road fully allow us to evaluate the actual parameters of the curves, which can form the basis for modeling the desired positions of the curves for the purpose of their certification. For this purpose, various orders and orders are drawn up annually, which set the main parameters of the curves in the plan and level, as well as the volume of work on the reconstruction (modernization) of the curves in order to bring them to the project documentation. In the Methodology introduced at the Belarusian Railways for evaluating the actual parameters of the installation of curves of track sections, general provisions given for the regulations that determine the procedure for performing actions when performing qualitative and quantitative assessments of the parameters of the geometry of the rail track. Depending on the state of the actual parameters, it is assumed that the curve will be assigned a certain status, which determines the order of its further operation, and depending on the ratio of the actual parameters relative to the design parameters, the degree of violation. The parametric analysis of this technique allowed us to generalize the results of structural, functional and informational analyses of the order of assessment of the level of disorder of curves, with assigning them the appropriate status, and the value of indicators that determine the degree of violation. The study of the parameters of curved sections revealed discrepancies in the qualitative and quantitative estimates of the same track sections, as well as the need for a comprehensive assessment of the actual and design parameters of the rail gauge geometry. -
V.3(47), 2021
116-130In the course of scientific support of design, construction and operation, as well as forecasting the development of transport infrastructure in the Arctic region, RUT (MIIT) scientists have proposed a methodology for working out new design and technological solutions by testing them on a small section of the route that has received the status of experimental; a number of solutions have been proposed that can be taken into account and used during the development of transport infrastructure in the Arctic. To verify the university's developments, a number of expeditions were undertaken to study the features of the conditions of construction of transport facilities, including climatic and engineering-geological, as well as the condition of existing transport facilities (the Salekhard - Igarka Polar Highway): survey expeditions in 2005, 2012; joint expeditions with the Russian Geographical Society with the participation of scientists from the Institute of Roads, Construction and Structures of the Russian Institute of Transport (MIIT) in the Arctic region in 2019 - 2021, during which a geomonitoring network was organized; data on temperatures in the air, near-surface zones and in the ground environment were obtained; the analysis of the ground environment was carried out; recommendations were given on the specifics of the construction of transport facilities, including the construction of the roadbed, using different variants of technical and structural and technological solutions. The purpose of the article is to generalize the experience of the development of the northern territories through the development of transport communications and the testing of new structural and technological solutions for the construction of the roadbed by means of a local section of the highway in the status of a pilot site. The approach presented in this article can be used to form a methodology for solving the problem of creating an effective High-latitude Russian transport system in the Arctic zone of the Russian Federation with forecasting trends in its development. -
V.3(31), 2017
132-143The article presents the results of measurements of electricity on active and passive sectioning posts the traction power supply system direct current sections of railways with III and IV path profile type. Basic characteristics of operating modes sectioning posts for the purpose of assessing the amount of electricity transferred and duration of work electricity storage in different modes are considered. The most observed voltage values, volumes of transmitted energy and duration of each case are defined. Choice of theoretical distribution laws, allowing to use the experimental values obtained in further calculations in modeling of operating modes electricity storage is completed. -
V.3(31), 2017
143-154In this article the tasks of simulation of flows on the railways are discussed. The main purpose of this work is to create a new simulation technology such a complex system as the rail network. Scientific novelty consists in the application of a combination of agent-based and discrete-event approaches in a given subject area. During the conducted study the models of behavior of agents were created, the problematic situation was highlighted and discrete-event part of the model was developed for this situation. The main categories of regular and emergency situations are analyzed, a list of situations for modelling are created. Choices for removal emergency situations were discussed, an algorithm for their processing (discrete-event part of the model) was chosen. An illustration of the study is a simulation model of the railway section of the West-Siberian railway with the possibility of rebuilding the train schedule, which depend on the addition of regular or emergency situation. As a result of the simulation, output such as a traffic graph and an information table are generated. There are plans to use new technology for creating model of "transport hub”.