Search results
-
V.3(43), 2020
66-75The article presents the main results of experimental studies within the boundaries of the Fadino - Novoseletsk, Novoseletsk - Strela interstitial zones of the Entrance - Irtysh section. As a result of the research identified problems that currently hinder the online monitoring of operational parameters of the electric rolling stock (EPS) and power supply devices: a lack of data on the work of the traction substations, the presence of EPS without registration motion parameters (RAPS), the lack of process data collection with RAP, the lack of a single source and process for obtaining data, insufficient memory storage device of cartridge, lack of data latch on the locomotive in General, lack a set of fixed parameters, non-constant sampling of parameter fixing, insufficiently detailed final documentation, imperfect software for exporting data from cartridges and lack of binding to global time. Shown the possibility of joining data from different automated systems of JSC "RZD" and measuring systems OSTU, which will allow us to estimate the losses in the traction network, the expense on own needs of electric rolling stock , the electric power consumption for traction and return of electric energy to contact network, as well as move forward with implementation of predictive control operation modes of the electric rolling stock and power infrastructure and Railways in a changing environment in the transportation process, to ensure the best conditions for the realization of tractive effort, regenerative braking, set train schedules, including in case of critical restrictions on the part of the power supply system, preventing train traffic from stopping.