Search results
-
V.4(48), 2021
47-56The article deals with the issue of using electric power storage systems in railway transport. It is noted that they are used in renewable energy sources and on hybrid shunting diesel locomotives. The possibility of using electric power storage systems to improve the efficiency of using electric power for train traction is indicated. The introduction of electric energy storage systems in the traction power supply system is hampered by high capital costs and the need to strengthen several adjacent inter-substation zones at once. It is proposed to consider the possibility of creating a mobile energy storage system, all the equipment of which will be placed in containers installed on cargo platforms, which will allow such a system to be quickly moved. The purpose of introducing a mobile power storage system is to temporarily strengthen the traction power supply system during a planned overhaul or emergency repair of one of the tracks on double-track sections of the railway. In this case, there is a need for a batch pass of trains alternately in even and odd directions on the same track. The possibility of using a mobile energy storage system is considered on the example of a real section of the railway. For a given schedule of passing train packages, the dependence of the storage capacity taken off from time, the maximum power and the nominal effective energy intensity of the storage system are determined. An estimate of the electricity storage system cost is given. It is shown that more than 70 % of the total cost of the electricity storage system falls on the imported energy conversion subsystem. It is concluded that it is necessary to develop domestic converter subsystems. -
V.4(52), 2022
106-114This article presents promising and widely used in transport construction methods of earth bed reinforcement with the use of geotextile as a reinforcing and separating layer. It was suggested to lay down geotextile coverings manually in the zones of rail joints of an equalizing span of a continuous-flow track by 6-10 sleepers in each side of the joint, in all, 12-20 sleepers where high-speed and high-speed passenger traffic is expected. Basic technical requirements and restrictions on geometric dimensions for geotextile when reinforcing the main track bed are given. The technology of manual laying of reinforcing geotextiles when a small section of the railway track needs reinforcement during routine maintenance and repair of the railway track is given. The sequence of basic manual laying of geotextile coverings in the technological "windows" is described. Experimentally conducted work on the device coatings of geotextile manually in the areas of rail joints equalizing span of permanent way for 6 sleepers on each side of the junction in the railway sections of the Tashkent railway station (PCH-2). A design for reinforcement of the main ground in the areas of rail joints has been proposed. The basic requirements to quality control of construction works in structures with the use of a layer of geotextile materials are given. -
V.4(20), 2014
118-123The method and research results of information obtained by track management cars about the track state for planning track repair work to eliminate track defects have been shown. The defect types and their degrees measured by the relevant assessment method as well as the lengths of deviation from the rules of track maintenance have been analyzed. This was possible due to the latest versions of the software installed into track management cars of the КВЛ-П system. The scope and sequence of repair track work depending on their urgency, top-priority and schedule under structural and seasonal conditions has been determined. The conclusion concerning the efficiency of the presented method has been made.