Search results
-
V.1(17), 2014
2-8The article contains methodology for assigning losses in two-element frequency converter (in rectifier and dc-ac converter). which allow to replenish mathematical model of back to back rig test method for induction motors and to use it in design induction motor rig test, also for calculation electrical power test rig which consumed from electrical network. Practical value of the methodology is no need in using electrical measurement instrument for ac-dc power with frequency different from 50 Gz. -
V.3(15), 2013
2-7The article contains information about policy public corporation «RZD» in energy-saving and energy efficiency. Assessment of energy efficiency of application back-to-back method in testing induction tractive motors was executed as an example on modeling testing process of motors type NTA-1200. -
V.1(13), 2013
48-54Despite significant progress in the development of accounting systems, there is almost universal growth accounting losses of electricity and reduce its quality. Along with the introduction of modern energy efficient electrical problem efficiency of electric energy in the stationary energy sector can be achieved through the implementation of active-adaptive technologies for controlling the operation of compensating devices, controlled means of voltage control, switching and power equipment and diagnosis based on digital technology, including automatically maintain a minimum transmission losses when the load. Management of objects offered no traction electricity consumers based on adaptive technology and hardware-software optimization mode parameters in real time. -
V.4(16), 2013
51-58There is the way for increasing efficiency of recuperative braking, using an energy storage device on electrical locomotives of DC railway. This device must store a part of recuperative energy. In the article the approach was considered, which allows to find parameters of an energy storage device, this device must be placed on electrical locomotives of DC railway, a part of recuperative energy can be returned to electrical network.