• Рус Русский
  • Eng English (UK)

Scientific and technical journal established by OSTU. Media registration number: ПИ № ФС77-75780 dated May 23, 2019. ISSN: 2220-4245. Subscription index in the online catalog «Subscription Press» (www.akc.ru): E28002. Subscription to the electronic version is available on the «Rucont» platform.
The journal is included in the Russian Science Citation Index and in the List of Russian Scientific Journals .

Search results

  • V.2(30), 2017
    65-76

    The safety’s increase of the freight electric locomotive’s traffic on account of the improvement of the integrity’s verification of the braking highway’s order before the departure to the following section

    The article discusses a question, which is bonded with the traffic safety, namely the integrity’s verification of the braking highway’s of the freight train before the departure. There was given a range of reports in the absence of the braking highway’s integrity’s test by the locomotive crews. There was the verification’s order developed and his testing done. There were made the suggestions for improvement of the safety devices in terms of automation of the integrity’s verification of the braking highway.
  • V.2(34), 2018
    65-75

    Study of operation modes of the electrical power supply system for installation of electric energy storage drivers

    The article deals with issues related to theoretical and experimental studies of operating modes of the traction power supply system. The analysis of the comparison of voltages on the tires of traction substations with uncontrolled rectifiers and tires of traction substations with converter units equipped with a system of non-contact automatic voltage regulation is shown, the differences between them are shown. The modes of operation of the active partitioning post with the point of increasing voltage have been studied in detail. As a result of research, it was found that the observation time of maximum voltage values at substation tires above the average no-load voltage level is about 5 -10% of the time of day, about 7 - 8% at active posts, and 10 - 13% at passive posts. The maximum power in the active mode of the post sectioning with the point of increasing the voltage at lower voltage in the contact network is 2.9 MW. The average amount of electricity returned to the contact network point of increase of voltage, in one case is 170 kWh. The average duration of work in active mode for one case is 8,6 minutes.