• Рус Русский
  • Eng English (UK)

Scientific and technical journal established by OSTU. Media registration number: ПИ № ФС77-75780 dated May 23, 2019. ISSN: 2220-4245. Subscription index in the online catalog «Subscription Press» (www.akc.ru): E28002. Subscription to the electronic version is available on the «Rucont» platform.
The journal is included in the Russian Science Citation Index and in the List of Russian Scientific Journals .

Search results

  • V.3(27), 2016
    110-117

    Nalysis of contamination of the crushed stone ballast

    This article contains information on the main pollutants and weeds on the railway. In the article the questions of the intensity of the contamination of the broken stone ballast. Specified criterion for assigning secondary and preventative maintenance of way in accordance with the technical specifications. Given reasons for the increased intensity of the contamination of the ballast in the first year of life. The analysis contamination of the broken stone layer in areas the Trans-Siberian Railway and the Medium-Siberian Magistral. The Trans-Siberian railway is considered towards Chelyabinsk - Karbysheva - Novosibirsk, the Medium-Siberian Magistral in the direction of the Input - Irtysh - Medium-Siberian. The analysis was conducted based on the data of geological investigations design and survey institutions and to schedules of repairs for the West Siberian infrastructure Directorate. For ease of estimation of the parameters of weeds the resulting material was consolidated into a single table. Based on the table were revealed of the according contamination of crushed stone ballast thickness, ballast layer, from the conceded tonnage and length of operation in years. The article describes the structure of the pollutants by particle size, in terms of pass excess tonnage. Indicated levels of contamination of crushed stone ballast at different values of the missed tonnage (700 million tons 1200 million tons and 1400 million tons). Additionally, this work was determined the average level of contamination of the ballast particles less than 25 mm, 5 mm and 0,1 mm) and obtained a limit value of the allowable clogging the broken stone ballast more than 30 percent. The result revealed the need for reducing the contamination of the broken stone ballast by conducting a deep cleaning.
  • V.2(22), 2015
    115-122

    Organizational and technological parameters of operation of bearing railway track machines cyclic action

    The models of complex organizational and technological parameters of operation of liner-straightening machines cyclic action on the example of the VPR-02 and VPRS-02 using a probabilistic assessment of the reliability of their work. For her study conducted two etapa checks: logical and mathematical. After sampling in accordance with GOST 8.207-76 inspect it belongs-rise normal distribution using Pearson's chi-squared test. Next calculated reliability and risk completion of the planned scope of work machine systems, complexes, components and individual machines in the planned period of time. The models are based on actual field tests of databases, technical and economic indicators of machines, components and systems in real operating conditions. This model optimizes track works with a given reliability at stave-builder, all kinds of repair and current maintenance of railway track. And also give the opportunity to the WHO-define more rational modes of operation of track machines for you, edits, tamping and straightening the railway line, thereby increasing pa O-workings of these machines. They enable organizations operating these machines more reasonably expect the required number of cars processes track works, their cost and labor. The proposed method models quantify the technical reliability of the liner-straightening machines; allow predicting the main complex organizational and technological performance of a particular machine at the design stage of technological processes track works. This method is versatile and can be used to evaluate the technical reliability of any machine systems, components and separate machines.
  • V.1(13), 2013
    117-125

    Methods destination mileage cars between depot repair

    The main provisions of the methodological foundations of state management systems, technical operation, the general approach to the creation of the state of systems management techniques and methods of technical operation of destination mileage cars between depot repairs on them. Practical recommendations for the use of freight cars.
  • V.2(38), 2019
    117-127

    Simulation modelling the functioning the technological processes of rolling stock units repair

    The article discusses issues of simulation modeling of technological processes of repair of rolling stock components. A model of the technological process of repairing a trolley (mod. 18-100) of a gondola car in an ARENA environment is given.
  • V.3(51), 2022
    126-135

    Influence of the transportation process technology on the electric freight locomotives exploitation efficiency

    Improving the efficiency of the main activities of JSC «Russian Railways» is currently a relevant and significant issue. According to the provisions of the company main strategic documents, the key performance indicators for the locomotives are to be improved by 2025 and continue so until 2035. The paper deals with the analysis of problems and proposals for improving the management of electric locomotives that carry most of goods on the railways of the Russian Federation. The paper analyzes the possibilities to improve the main operational indicators of locomotive complex by increasing the efficiency of the organization of electric locomotives operation. One of the key performance indicators of the locomotive complex is the average daily performance of electric locomotives. To improve this indicator, it is necessary to increase the amount of work per unit of electric traction rolling stock. The given paper proposes two ways to achieve this. Firstly, it is the qualitative improvement of advantageous locomotives, increasing their traction properties; secondly, the improvement of the technology used to manage traction systems. The paper shows that in order to achieve the company targets, JSC «Russian Railways» has to necessarily implement the second solution, namely, introduce and improve the polygon technologies for managing traction resources and switch to extended railroad hauls of electric locomotives. The paper presents the main requirements and conditions for implementing these technical solutions.
  • V.3(31), 2017
    132-143

    Results of evaluation of operating modesactive and passive sectioning postsin the traction power supply system for the purpose of electricity storage device parameters selection

    The article presents the results of measurements of electricity on active and passive sectioning posts the traction power supply system direct current sections of railways with III and IV path profile type. Basic characteristics of operating modes sectioning posts for the purpose of assessing the amount of electricity transferred and duration of work electricity storage in different modes are considered. The most observed voltage values, volumes of transmitted energy and duration of each case are defined. Choice of theoretical distribution laws, allowing to use the experimental values obtained in further calculations in modeling of operating modes electricity storage is completed.
  • V.4(28), 2016
    134-141

    Organization of operational control by methodof the consecutive analysis

    In article the solution of a task of the organization of operational monitoring of elements of the rolling stock on the basis of the methods of statistical definition of quality which were widely used in the analysis of defects of the current production is considered. The problem is solved on the example of carrying out control and diagnostic operations by results of which realization the conclusion about technical condition of elements of the rolling stock becomes. The approach offered in article allows to consider a posteriori information and by that to optimize the volume of the carried-out works. The received results can be used at the solution of a complex of tasks of decrease in resource intensity of system of repair and the maintenance of the rolling stock.