Improved method of calculation tensity of permanent tunnel lining with temporary shotcrete lining factor
Article reference
Lanis A. L. , Tsibarius Y. A.
Improved method of calculation tensity of permanent tunnel lining with temporary shotcrete lining factor Izvestiia Transsiba – The Trans-Siberian Bulletin,
2014, no. 1(17), pp. 78 – 84.
Abstract
Shotcrete lining is one of the most common types of temporary supports in tunnel construction. The influence of shotcrete lining on design calculations of permanent lining is difficult, because there is no method of designing at the present time. This leads to increasing in consumption of materials and labour of construction. The information about the influence of the basic mechanical properties of soils, geometrical size of construction per value of temporary shotcrete lining factor was obtained during research. These data formed the basis for futher development method of designing. Empirical correlations of stress distribution between temporary shotcrete lining and permanent monolithic reinforced concrete lining were obtained during theoretical research. Results of experimental research tensity of temporary shotcrete and permanent lining confirmed the possibility of using in the designing this empirical correlations. Using in the designing proposed empirical correlations will leads to reduction in consumption of materials and labour of construction.