Search results
-
V.1(17), 2014
78-84Shotcrete lining is one of the most common types of temporary supports in tunnel construction. The influence of shotcrete lining on design calculations of permanent lining is difficult, because there is no method of designing at the present time. This leads to increasing in consumption of materials and labour of construction. The information about the influence of the basic mechanical properties of soils, geometrical size of construction per value of temporary shotcrete lining factor was obtained during research. These data formed the basis for futher development method of designing. Empirical correlations of stress distribution between temporary shotcrete lining and permanent monolithic reinforced concrete lining were obtained during theoretical research. Results of experimental research tensity of temporary shotcrete and permanent lining confirmed the possibility of using in the designing this empirical correlations. Using in the designing proposed empirical correlations will leads to reduction in consumption of materials and labour of construction. -
V.2(46), 2021
94-104The main engineering problem associated with the degradation of permafrost and cyclic freezing-thawing of seasonal permafrost soils is a decrease in the bearing capacity of engineering structures due to the degradation of the main physical-mechanical properties of the embankment soils. The cyclical change in temperature leads to regular freezing-thawing of the soil, as a result of which such types of deformations occur as heaving during freezing and settlement during thawing. The purpose of this work is to highlight new information about complex measures to stabilize the subgrade of railways and highways in the cold regions of China. The paper considers such measures as thermosiphon stabilization, rock fill, installation of ventilation pipes and laying of thermal insulation boards. This paper also describes the disadvantages of existing measures for stabilizing the temperature regime of the embankment and its base. Considered the main transport network of the Qinghai-Tibet plateau, including the Qinghai-Tibet railway and four highways. The experimental section of the Wushu-Xining expressway on the Qinghai-Tibet plateau was chosen as the object of the study of numerical modeling; a numerical calculation of the temperature and moisture content fields of the typical embankment was carried out, as well as numerical calculation of the embankment with rock fill for the 10th year of operation. The calculations were carried out on the basis of the «Freeze-Cold» software package specially developed for engineering calculations of the freezing and thawing process in soils. The calculation showed that rock fill allows to reduce the area of the soil thawing, raising the front of frozen soil, helps to reduce the degradation of frozen soil, which ultimately has a positive effect on the bearing capacity of the entire engineering structure. Analysis of the collected data and calculated values allows to conclude that the use of rock fill of 0,8 meters depth as an insulating material to maintain the stability of the thermal regime of the embankment on frozen ground in the considered region of the Qinghai-Tibet Plateau. -
V.3(15), 2013
125-133Shotcrete lining is one of the most common types of temporary supports in tunnel construction. The influence of shotcrete lining on design calculations of permanent lining is difficult, because there is no method of designing at the present time. This leads to increasing in consumption of materials and labour of construction. The information about the influence of the basic mechanical properties of soils, geometrical size of construction per value of temporary shotcrete lining factor was obtained during research. These data formed the basis for futher development method of designing.